<div dir="ltr"><div>All:</div><div><br></div><div>See the message below from Dick Fullerton wrt to sump pump inspections.</div><div><br></div><div>See you in the morning.</div><div><br></div><div class="gmail_quote">---------- Forwarded message ----------<br>From: <b class="gmail_sendername">Richard Fullerton</b> <span dir="ltr"><<a href="mailto:rbfullerton@gmail.com" target="_blank">rbfullerton@gmail.com</a>>y</span><br>Date: Wed, Jul 12, 2017 at 11:50 AM<br>Subject: MHWSD Rules and Regs<br>To: <a href="mailto:harold.roberts@chnorthmetro.us" target="_blank">harold.roberts@chnorthmetro.us</a><br><br><br><div dir="ltr"><div style="font-size:small">Harold - <br><br></div><div style="font-size:small">Thanks for the update this morning. The contractor we used for sump pump inspections was:<br><br><div style="margin-left:40px">- C&L Water Solutions, Christopher Jones <a href="tel:(303)%20472-2339" target="_blank" value="+13034722339">303-472-2339</a><br></div><div style="margin-left:40px"><br></div>Attached you will find our Rules and Regs. I believe this is the latest version, but because it is not dated, it could be a draft version. I'll try to confirm. The penalty for failing to allow inspections was adopted separately at a Board meeting to consist of <br><br></div><div style="font-size:small">1st violation - waiver of fee<br></div><div style="font-size:small">2nd violation - $150<br></div><div style="font-size:small">3rd violation - $150<br></div><div style="font-size:small">4th and additional violations - $500<br><br></div><div style="font-size:small">Let me know if you have questions.<br><br></div><div style="font-size:small">Dick Fullerton<br></div></div>
</div><br></div>